M&K Junction Railroad

M&K Junction Railroad
Another train of eastbound coal crosses the Cheat River

Sunday, January 17, 2010

More Progress Photos

Here are some pictures of the Cheat River bridge and some in-process pix.


The Cheat River Bridge - still unfinished!!


The Cheat River Bridge looking 'west'




The Cheat River Bridge looking 'east'


Looking west at bridge level



Looking east at bridge level.

Until I enlarged this photo preparatory to uploading it, I had not noticed that the guard rails on the westbound (left) track at the far end of the bridge are quite crooked. You cannot see this when looking from above. I'm finding that the camera is an excellent tool to check your work.


Roadbed laid for the outer track west of the bridge on the Cheat River grade.


Double roadbed construction, cork over foam


Smooth curves on the outer track, not easy to do with Micro Engineering so-called 'flexible' track


The outer track is progressing


Further on down the line





No comments:

Post a Comment